• Operation with 1 type of concrete.
• Elevator and 5-height / 5 tray lift.
• The installation includes 1 hopper with double mouth for a uniform and faster casting of the concrete in the mold filling.
Only three operators (at least) are required to handle the entire installation. Automated checks.
• An operator (at least) will be responsible for monitoring the installation and for handling the forklift to remove the trays with cool material from the elevator, store it within the same ship and transfer the cages With cured material until you place the trays on the descender.
• Two operators (at least) will be responsible for palletizing the finished parts and their storage manually.
• 100/200 Cages for storage and drying of fresh material, not including drying tunnels.
• 1 Forklift.
• Effective machine production: 4/5 trays per minute.
• Minimum material height: 4 cm.
• Maximum material height: 35 cm.